Skip to main content

Editing Bulkheads

Moving

Click and drag the bulkhead to reposition it on the canvas. All connected wires follow automatically.

Rotating

Double-click the bulkhead to enter rotation mode. A rotation handle appears, allowing you to rotate the connector to any angle.

Resizing

Click on the left or right plug of the bulkhead. A resize handle appears at the bottom center. Drag it to adjust the height. The minimum height is enforced automatically, and pins reposition to fit the new size.

Pin Management

Adding a Pin Group

  1. Right-click on the bulkhead plug.
  2. Select Add Pin Group.
  3. Enter a label for the new pin pair.

A new pin pair (left and right) is added to the bottom of the bulkhead.

Renaming Pins

  • Rename a single pin — right-click a pin and select Rename Pin to change one side's label independently.
  • Rename a pin group — right-click a pin and select Rename Pin Group to change the label on both the left and right pins at once.

Deleting a Pin Group

Right-click a pin and select Delete Pin Group to remove the entire pin pair. All wires connected to those pins are also deleted. At least one pin group must remain on the bulkhead.

Moving Pins Vertically

Drag a pin up or down within the bulkhead to reorder it. Both the left and right pins in the pair move together. Pins are constrained to stay within the bulkhead boundaries.

Context Menu Reference

Bulkhead (right-click the plug area)

ActionDescription
DeleteRemove the entire bulkhead and all its connections
Add Pin GroupAdd a new pin pair with a specified label
Rename BulkheadChange the bulkhead's display name
Copy to TabCopy the bulkhead to another sheet
Add to BOMAssociate with a Bill of Materials entry (Pro)

Pin (right-click a pin)

ActionDescription
Rename PinChange one pin's label
Rename Pin GroupChange both pins in the pair
Delete Pin GroupRemove the pin pair and its connections
Add to BOMAssociate with a Bill of Materials entry (Pro)